试卷,试题,examination paper.
首 页 论文分类 论文搜索 论文精华 写作指导 友情链接 留言板  
计算机 | 金融 | 经济 | 会计 | 工商 | 财政 | 财务 | 公共 | 管理 | 文化 | 艺术 | 社会 | 教育 | 工科 | 理科 | 文学 | 法律 | 医学
 
     当前位置:首页>>写作指导>>正文
 

英文简历(电子工程师)ELECTRONICS ENGINEER(Experienced)

文章出处:中国论文下载中心   发布时间:2005-11-11
  Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
  
  BACKGROUND SUMMARY
  Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.
  
  PROFESSIONAL WORK EXPERIENCE
  Stevenson Data Systems,Los Angeles,CA 1981-1993
  Components Evaluation Engineer 1992-1993
  Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.
  
  Design Evaluation Engineer 1990-1992
  Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.
  
  Assistant Engineer 1981-1990
  Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.
  
  EDUCATION
  Bachelor of Science in Electrical Engineering
  --University of Southern California 1990
  Associate in Engineering Electronics
  --University of Southern California 1981
  
  Job descriptions emphasize candidate's accomploshments.
  Work history is stated in reverse chronological order,with most recent employment listed first.
转贴于 中国论文下载中心 http://www.lunwen86.com
[返回顶部↑]  
 
 
 
  相关文章
·英文简历(工业工程师)
·如何写好毕业论文
·本科毕业生论文评定标准
·毕业论文的答辩
·会计论文的写作程序与要
·会计论文的结构
·会计论文的现状与特点
·会计论文的写作准备工作
·入党申请书
  热门点击
·毕业论文的结构原则
·入党申请书
·会计论文的写作准备工作
·会计论文的现状与特点
·会计论文的结构
·会计论文的写作程序与要
·毕业论文的答辩
·本科毕业生论文评定标准
·如何写好毕业论文
·英文简历(工业工程师)